The thermal insulation works were carried out for tanks and antenna lines with diameters of 30 inches and tanks with cubic capacities (5 meters – 10 cubic meters – 20 meters) and the facades of the feed plant necessity project. A large number of the company’s competencies for the work apparatus at the speed of work within a very short period. Thermal insulation was done from rock wool and aluminum 0.8 mm. 100 high temperature treatment was done for the company to insulate the thermal furnaces. The work date was started on 7/1/2017 and it was approved within 3 months only A time period of one year is given for all thermal insulation works.