We National Company for Contracting and Electromechanical Works are honored to carry out maintenance works of high pressure boilers (critical pressure) and supply and installation of boilers of high pressure (50: 100 tons) up to pressures of 70 bar and contain (Economizer) with the presence of air heating process to give higher efficiency when Operating with the possibility of raising the efficiency of high pressure boilers from changing drams and changing the pipes of the boiler in all diameters and pipes Suitable to work with high pressure boilers, pipes and drams
are all imported from abroad (Germany-made) will be presented certificate of origin and analysis of pipes and pipes Withstands heat and high pressure, the efficiency of super heater and economizer will be increased Special boiler and all pipes are subject to bending by an electric machine does not enter the human factor and all welds Argon are the hands of accredited welders and all installation works are in accordance with the principles of industry where the thermal construction of refractory bricks and refractory and thermal clay all building materials import from abroad (Union Testing will be carried out by penetrating fluid where a hydraulic test is done (one and a half times the operating pressure) where an internationally certified certificate is presented.
©All Rights Reserved. 2020. WATANYA design and development BY Engazmedia