The thermal insulation works were carried out for tanks and antenna lines with diameters of 30 inches, tanks with cubic capacities (5 meters – 10 cubic meters – 20 meters) and the facades of the fodder plant necessity project, and the project was completed within 4 months only in the case of implementation it will take one year thanks to another project. Significant competency for the company to complete the work quickly
The steam networks of the vacuum factory were implemented and linked to the new factory on 10/8/2016, and the pipes would all smooth schedule 40 lines (6 inches – 3 inches – 2 inches). A steam battery with a diameter of 1 meter, a length of 3 meters was manufactured. All welds work was Argon, and the welds were tested by ( GLOBAL LOUTS)
A project to raise the efficiency of a high-pressure steam boiler with a volume of 35 tons of steam / hour at a pressure of 30 bar was implemented on 1/15/2017, and all the work of installing the pipes and insulating the boiler in the thermal buildings was completed within only 6 months thanks to the engineers and technicians of welding and refrigerators. The work was completed in a timely manner. Speed and the project was done in a short period
©All Rights Reserved. 2020. WATANYA design and development BY Engazmedia